Agency Handovers: Keep Client Approvals Moving During Leave

Do not leave approvals in one teammate's memory during their leave. Hand over the current version, pending decision and next owner through a clear process.

PO

Postonay···6 min read

Sorumluluğun devrini anlatan, kobalt mavi bir çubuğu elden ele güvenle aktaran iki kişinin elleri
Contents (6)

If only one teammate can explain a client's work, that work lives in their memory rather than the agency's process. The content manager goes on leave, a client asks late at night whether the final version was approved, and nobody in the group can answer confidently. The files exist, but the person who knows which version matters is absent. Instead of taking over established work, the team starts reinterpreting old conversations.

A handover needs more than a folder link sent on the last day. The next person must find the current item, understand its status, and know who helps complete the next step. The client needs to know whom to contact too. Without those details, the person on leave cannot switch off and the person covering cannot take responsibility confidently.

What does a handover note need beyond the files?

A folder does not explain the stage of the work inside it. Several visuals may exist for one item, the caption may sit elsewhere, and the latest request may survive only in a message. Starting a handover note as a file list collects those parts without necessarily connecting them. Write the current state of each item first, then attach the relevant files.

The next person should be able to answer three questions: Which item are we working on, what is missing, and who will resolve it? 'Waiting for the client' leaves the last question open. State who needs to make which decision on which version. If it is unclear whether they are reviewing a visual or confirming a price, the next message cannot be directed properly.

Separate completed decisions from outstanding requests. A visual the client has accepted and a draft that received a positive comment should not automatically share the same ready status. Show which version each decision applies to. Presenting an uncertain item as complete transfers the gap to the next person instead of resolving it.

A good handover makes the owner of the next decision visible before it transfers the files.

Step 1: Use more than 'finished' and 'waiting' as statuses

Copy the agency needs to prepare and a visual awaiting client approval are waiting for different things. One needs production; the other needs a decision. Checked content that has not been submitted is another distinct stage. Without those distinctions, the next person has to reopen every task.

Name the next concrete action on each item. Use statements such as 'increase the product size', 'client to confirm the price in the caption', or 'submit the checked version'. Prioritise the action over a long history. If the previous conversation is needed, show where it can be found.

Consider the planned date alongside the current state. Do not place unapproved content among ready items simply because the date is near. Explain which decision the date depends on and who will discuss a revised plan if no response arrives. Otherwise the person covering may feel responsible for a promise they were never told about.

Step 2: Clarify access and the communication contact separately

Being able to see a file does not mean being authorised to decide for that client. Check access to the relevant brand area, without granting unnecessary access to every brand as part of the handover. Establish which area the task requires. Check where internal notes that are not for the client will remain.

Name the client's decision owner in the handover note. Do not assume the fastest person to reply in the group is authorised. Explain any boundary between a manager's comment and the decision it cannot replace. A new contact should not have to discover the client's decision structure by guesswork.

Tell the client about the change before coverage begins. Explain who will handle the work during which dates and that pending items continue through the same process. Do not introduce the replacement by asking the client to retell every previous decision. The agency should carry the transfer work and request confirmation only where something is genuinely unclear.

Do not leave the person on leave as an invisible backup

'We will call if anything happens' conceals handover gaps. Agree who handles decisions the covering person cannot make, and clarify the limits of new commitments to the client.

Step 3: Test the handover on a real content item

Reading the note does not prove that someone can take over the work. Before leave begins, choose an actual pending item and ask the next person to explain the next action independently. If they still need the previous owner to identify the version or contact, information is missing. Apply this sequence to that item:

  • 1Write down the current stages of pending items. Match each visual and caption to the correct version.
  • 2Show completed decisions separately from open requests. Do not mark unclear approval as complete without confirmation.
  • 3Specify the next concrete action and its owner for each item. Include dependencies that could affect the planned date.
  • 4Check that the covering person can access only the brand areas they need. Separate the client's view from internal work.
  • 5Tell the client the temporary contact and the dates they will cover. Continue from the relevant content rather than restarting the decision history.
  • 6Have the covering person check one item from start to finish. Add their questions to the handover note and check the remaining work for the same gaps.

The rehearsal may reveal a need to check an item again. If the covering person nearly applies an old version's approval to a new file, do not treat that only as an attention problem. Repair the point where the connection between version and decision was lost. Look for the same gap across all pending work instead of explaining just one file.

A longer handover note is not automatically safer. A page of decision history can obscure the next action. Put the current state first and keep supporting detail available when needed. Understanding what to do at first glance matters more than memorising the whole history.

How should you take work back after leave?

The handover needs a closing step when the original owner returns. Review decisions made during the absence, changed dates, and remaining requests together. Someone who opens their old file and resumes where they stopped may miss a newer approved version. Start from the current record on return too.

Briefly tell the client whom to contact next. If the covering person began something that remains unfinished, the client should not have to repeat the request to both people. Establish the point at which responsibility returns. Add the most frequently asked handover question to preparation for the next absence.

Postonay connects content preparation, internal checks, and client approval in a separate brand portal with brand-based permissions and publication calendar planning. Before the next period of leave, ask someone else to explain one open item using its record alone. Use the 30-day free trial to find where the handover stops; no credit card is required.

Set up your approval process properly, once

Make an open item's current version, pending decision, and next responsible person visible to your team.

Start Your 30-Day Free Trial

Frequently asked questions

What does an agency handover need beyond the files?

The next person must know which content is being handled, what is missing, and who will resolve it. Separate decisions already made from outstanding requests.

How should access and contact ownership be recorded?

Seeing a file does not mean being authorised to decide for the client. Name the client's decision owner and the temporary agency contact, and give the covering teammate access only to the brand areas they need.

Is keeping the person on leave available for emergency calls enough?

No. That arrangement conceals gaps in the handover. Do not leave the person on leave as an invisible backup.

How can you test whether a handover works?

Have the covering person check one real item from start to finish. Add their questions to the handover note and close the same gaps in the remaining work.

Found this useful? Share it: